F.A.T. STATION Factory Acceptance Test Platform
Space = play/pause · ← → chapter · R restart
01 / 16 The test room
Physical scene Description.
LINE 2 · MACHINE C-02 M P1 IC P2 LINE 3 · C-03 M QUADRO ELETTRICO L1 L2 L3 0.0 kW 50.0 Hz A 0 V 400 ON / OFF 400V · 3~ MACHINE — COMPRESSOR GAS INLET ~1 bar MOTORE ~55 kW ~100 A POMPANTE 1 compression chamber Intercooler 45 °C POMPANTE 2 optional · multi-stage 50 °C Aftercooler PT1 BUFFER 0 barg XV-01 XV-02 PI report
F.A.T. STATION v1.6
Test operator
MACHINE C-01 S/N 2026-01 · Line 1 · multi-stage template
PLC OK | HMI VNC WAITING
Operator
Test Operator 01
Recording
PAUSA
Machine template
Multi-stage compressor
Audit trail
user | phase | timestamp
Leak test
Startup + 1st cylinder
Medium load
Full load
Endurance
Shutdown + vent
LIVE
Linear audit active · no open alarms · consistent data per phase
line 1
DISCHARGE PRESSURE
---
barg
PORTATA --- Nm³/h
INLET PRESSURE
---
mbarg
TEMPERATURE --- °C
COMPRESSORE
STOPPED
CMD --- Hz FBK --- Hz
--- kW --- A
Waiting for conditions
Hz target: 50.0 ± 5% · stab. 60s
Frequency HzN/D
/ 50.0 ±5%
Pressure PT1OFF
/ phase target
StabilizationN/D
/ 60 s
TREND
P&ID
HMI
MACHINE C-01 · Line 1
Live trend — Discharge Pressure · 1 Hz sampling
200 100 0
FOLIO 1 · PROCESS
FOLIO 2 · HYDRAULIC
FOLIO 3 · COOLING
P&ID SHEET 1 — GAS PROCESS CIRCUIT INLET MOTORE 55 kW POMPANTE 1 INTERCOOLER POMPANTE 2 AFTERCOOLER BUFFER 198 barg → discharge PT-I01 ISA 1.0 bar PT-01 ISA 60 bg TT-01 ISA 48 °C PT-02 ISA 130 bg TT-02 ISA 52 °C PT-M01 ISA 198 bg
FOLIO 1 · PROCESS
FOLIO 2 · HYDRAULIC
FOLIO 3 · COOLING
P&ID SHEET 2 — HYDRAULIC / COOLING CIRCUIT OIL TANK 300 L 72 °C POMPA oil pump OIL COOLER FILTRO GRUPPO VALVOLE XV reversing PRV relief FCV proportional CILINDRI actuation TT-H01 ISA 68 °C PT-H01 ISA 220 bg oil tank cylinder actuation
FOLIO 1 · PROCESS
FOLIO 2 · HYDRAULIC
FOLIO 3 · COOLING
P&ID SHEET 3 — COOLING CIRCUIT SKID COOLING water + glycol circuit POMPE N+1 SCAMBIATORE 1 SCAMBIATORE 2 DRY COOLER EC fans TT-C01 ISA 29 °C TT-C02 ISA 33 °C FT-C01 ISA 48 m3/h cooling circuit supply compressor and oil cooling
noVNC · operator HMI panel · 192.168.75.10:5900 READ-ONLY
OPERATOR PANEL · MACHINE C-01 MODO: REMOTE · CICLO: RUNNING
DISCHARGE
198.4
INLET
0.98
PORTATA
1195
FREQ MOT.
50.0
POT. MOT.
179
T OLIO
72
ALARMS: 0 UP: 02:14:37 SW: v4.2.1
Electrical Cabinet Date (live)
L1 [A]
---
L2 [A]
---
L3 [A]
---
AVG [A]
---
P L1 [kW]
---
P L2 [kW]
---
P L3 [kW]
---
P TOT [kW]
---
EMERGENCY SHUTDOWN
ESD ALARM ACTIVE
Class
ESD
First out
PTM01_HH
Source tag
PT-M01
Operator
Acceptance Test 01
PRESSIONE_DISCHARGE_HH 00:12:34
Discharge pressure over critical threshold 210 barg — PSV threshold 205 barg
tag: PT-M01 · value at trigger: 212.0 barg
TEMP_GAS_POMPANTE2_HH 00:12:35
Gas temperature 2nd cylinder 215 °C — safety chain latched
tag: TT-02 · first reset only after generic ACK
Machines under test dashboard
one machine per line · real-time status · large gauges with inlet + discharge pressure
LINE 1 · MACHINE C-01
Operator 1 · phase 4/6 · full load
REC PLC OK HMI VNC
RUNNING
Phase 4 of 666%
0.98
mbarg
Inlet
198
barg
Discharge
50.0 Hz · 179 kW · 279 A PT ± 0.8%
LINE 2 · MACHINE C-02
Operator 2 · phase 3/6 · 2nd cylinder
PSD PLC OK ACK pending
ESD
Phase 3 of 648%
1.1
mbarg
Inlet
212
barg
Discharge
⚠ 2 active alarms — PSV trip ACK pending
LINE 3 · free
no acceptance test in progress
READY PLC STBY
FREE
Session0%
mbarg
Inlet
barg
Discharge
ready
LINE 4 · MACHINE C-03
Operator 3 · phase 5/6 · endurance 4 h
STAB PLC OK WS LIVE
STABILIZATION
Phase 5 of 684%
1.0
mbarg
Inlet
195
barg
Discharge
49.8 Hz · 178 kW · 276 A stab. 42/60 s
Platform configuration
lines, catalog instruments and machine templates — all configurable without touching code
LINES
STRUMENTI
MACHINE TEMPLATE
Line Protocol PLC endpoint Breaker panel HMI VNC Status
Line 1OPC UAopc.tcp://10.0.0.11:4840Breaker 1 · 400A192.168.75.10IN TEST
Line 2OPC UAopc.tcp://10.0.0.12:4840Breaker 2 · 400A192.168.75.11IN TEST
Line 3Modbus TCP10.0.0.13:502Breaker 3 · 250AFREE
Line 4OPC UAopc.tcp://10.0.0.14:4840Breaker 4 · 630A192.168.75.12STABIL.
Line 5Simulationmock · cycle FSMDEMO
TagDescriptionGroupUnitRangeAlarm threshold
PT-M01Discharge pressurepressuresbarg0 ÷ 250HH 205
PT-I01Inlet pressurepressuresmbarg-10 ÷ 50LL -5
PT-01Cylinder 1 pressurepressuresbarg0 ÷ 150HH 120
PT-02Cylinder 2 pressurepressuresbarg0 ÷ 250HH 210
TT-01Intercooler gas temp.temperatures°C0 ÷ 150HH 95
TT-02Aftercooler gas temp.temperatures°C0 ÷ 150HH 90
FT-01Discharge flowflowsNm³/h0 ÷ 2000
TT-H01Hydraulic oil temp.temperatures°C0 ÷ 120HH 85
Machine template
● Multi-stage compressor
Single hydraulic booster
Single screw compressor
Multi-cylinder parallel
+ new template
Multi-stage compressor
8 instruments · 6 phases · 2 P&ID sheets · 3 critical alarms
Phase sequence
1. Leak test
2. Startup + 1st cylinder
3. 2nd cylinder — medium load
4. Full load — 100%
5. Endurance 4 h
6. Shutdown + vent
Associated instruments
PT-M01 · PT-I01 · PT-01 · PT-02 · TT-01 · TT-02 · FT-01 · TT-H01
Scalability — more shop floors, same platform
on-prem node for a single shop · centralized VM for multi-site industrial groups
F.A.T. STATION Backend · Datebase · Report engine central VM or on-prem node WebSocket + REST + OPC UA TEST SHOP A 4 active lines TEST SHOP B 6 active lines TEST SHOP C new deployment SITE PARTNER remote access One centralized platform · multiple shop floors · multiple roles · same audit trail deployment: on-prem VM · self-hosted cloud · hybrid
Multi-device access
operator, control room, supervisor, QA/client — different roles, same real-time data stream
TAB
Tablet
Test operator
On the shop floor, next to the machine. Can start/stop phases, acknowledge alarms, sign the certificate at end of test.
START · STOP · ACK · SIGN
ROOM
55" Monitor · Control Room
Test room
Overview of all shop-floor lines at a glance. Sees status, pressures, alarms, phase progress on every machine.
OVERVIEW · DASHBOARD LIVE
MGR
Laptop · Office
Supervisor / Manager
Daily KPIs, test history, reports by job order, archive of signed certificates. From the office or on the move.
KPI · ARCHIVE · REPORT
QA
Optional remote access
Customer / QA
Can follow their machine's test read-only — status, phases, alarms and outcome — without being physically on the shop floor.
READ-ONLY · STATUS · CERTIFICATE
Technical architecture
multi-device · backend modulare · connettori PLC + quadro elettrico · database TimescaleDB · report engine
OPERATOR TABLET on shop floor CONTROL ROOM 55" monitor LAPTOP RESP. from office CLIENT REMOTO smartphone · HTTPS F.A.T. STATION FRONTEND Next.js 14 · React · Tailwind · responsive tablet/desktop/mobile F.A.T. STATION BACKEND NestJS · TypeORM · Socket.IO · REST connectors sessions phases alarms reports templates audit archive machines lines users ACL websocket instruments PostgreSQL + TimescaleDB catalog · 1 Hz samples · audit REPORT ENGINE ExcelJS + Puppeteer PDF MACHINE PLC OPC UA Siemens · Modbus TCP QUADRO + BREAKER network analyzer · OPC UA HMI PANEL Siemens KTP · noVNC bridge MOCK · SIMULATION cycle FSM · training/demo
F.A.T. STATION
Acceptance Test Certificate
doc. cert/2026/00042
rev. 1 · pag. 1/4
09/04/2026
Machine CodeMACHINE C-01
Serial numberMATR 2026-01
ModelMulti-stage compressor
Rated power55 kW
Nom. discharge pres.200 barg
Suction pressureatm.
Order no.
Test lineLine 1
Test date09/04/2026
Ambient T22.0 °C
Rel. humidity55 %
Hydraulic oilISO VG 46
Test conditions per phase (acquired average values)
# Phase Duration Discharge pres. Inlet pres. Gas T Flow Hz kW A avg Result
1Leak test + N₂00:04:12 5.2-2.824 00.000 PASS
2Startup + 1st cylinder00:06:48 580.138 31028.44862 PASS
32nd cylinder · medium load00:08:20 1280.554 7201125082 PASS
4Full load 100%00:10:04 1980.968 119517950100 PASS
5Endurance 4 h04:00:32 2000.970 120518150101 PASS
6Shutdown + vent00:03:45 0062 0000 PASS
Discharge pressure trend (entire acceptance test)
Final result
6 / 6 PHASES PASS · margine portata entro ± 3% · margine consumi entro ± 2.5% · 0 allarmi ESD · 0 interventi operatore
Collaudatore
Test operator
09/04/2026 · 16:42
QA Manager
Quality Manager
09/04/2026 · 16:55
RT Cliente
End customer
09/04/2026 · 17:02
Pre-start safety and phase setpoints
before starting the test the platform checks conditions, roles, line and recording criteria
Checklist ready to START
MACHINE C-01 · line 1 · multi-stage template · phase 1/6
6 checks / 6 OK
Safety permissives and interlocks
emergency chain, auxiliary cabinet and machine permissive present
OK
Line assigned and instruments available
Line PLC, network analyzer and HMI reachable
OK
Operator authorized for testing
authenticated user, signature and audit linkable to the session
OK
Phase recipe loaded from template
setpoints, tolerances, alarms and expected duration already set
OK
Recording gate configured
samples saved only after stabilization within window
OK
P&ID, trends and HMI already open in the same session
the operator does not need to switch screen or look for other tools
OK
Phase 1 · leak test
5.0 barg
required pre-test pressure with 60 s stabilization before recording values.
Test gas: N₂
Pressure tolerance: ± 3%
Inlet limit: -5 ÷ +20 mbarg
Recording gate
1 Hz
continuous sampling with recording locked until the machine is within the phase criteria.
Next Hz target: 50.0 ± 5%
Minimum stability: 60 s
Audit trail: user, phase, result
Commercial output
The demo shows the test starts only when the line is truly ready, and the certificate inherits criteria and results from the session with no manual transcription.
Acceptance test archive and historical trends
search by machine, phase, line, outcome and time window with instant access to reports and history
Current month
Line 1
Multi-stage compressors
PASS
Trend
Machine Date Line Duration Result Report
MACHINE C-01 09/04/2026 08:42 1 04:33:41 PASS Excel + PDF
MACHINE C-02 08/04/2026 15:16 2 03:57:19 PASS Excel + PDF
MACHINE C-03 07/04/2026 11:03 4 00:51:08 HOLD reopened
MACHINE C-04 04/04/2026 09:20 3 04:49:55 PASS Excel + PDF
Regenerable reports
1 click
no manual searching through network folders
Trend per phase
history
instant comparison between similar acceptance tests
PT discharge · MACHINE C-01 · full load target 200 barg
Impact for the plant director
F.A.T. STATION

A single digital flow for testing, alarms, reports and machine archive.

The demo closes the loop: the operator works in a single session, the supervisor sees the whole shop floor, QA signs a certificate consistent with the acquired data, and the history stays available for audits, post-sale and disputes.

Fewer disconnected tools
1
trend, P&ID, HMI, alarms and certificate live in the same platform instead of scattering across HMI, Excel and shared folders.
More line control
live
each machine occupies a dedicated line with current phase, status, recording criteria and alarms already readable from the dashboard.
Complete audit trail
100%
ACK, signatures, safety blocks, samples and phase transitions stay correlated to the acceptance session and the final certificate.
Low-risk rollout
step
start from a pilot line, then extend to the shop floor and further sites without changing the operating model.
STEP 01
Pilot line
One machine, one line, templates and reports already standardized.
STEP 02
Full shop floor
Multi-line dashboard, operator/QA roles and a single plant archive.
STEP 03
Industrial group
Multiple shop floors on the same platform with shared governance and history.
STEP 04
After-sales
Trends, reports and audit trail available even after the machine acceptance test.
F.A.T. STATION
Factory Acceptance Test, reinvented
1single session
1 Hzphase sampling
Excel + PDFauto certificate
auditcomplete trail
multi-linelive dashboard
step-by-steplinear rollout